Required Equipment; Unpacking And Inspecting The Chassis - Cisco UCS 5108 Installation Manual

Server chassis
Hide thumbs Also See for UCS 5108:
Table of Contents

Advertisement

Installation
• Use the following torque values when installing the chassis:

Required Equipment

Before you begin the installation, ensure that you have the following items:
• Number 1 and number 2 Phillips-head screwdrivers with torque measuring capabilities
• Tape measure and level
• ESD wrist strap or other grounding device
• Antistatic mat or antistatic foam

Unpacking and Inspecting the Chassis

Caution
When handling chassis components, wear an ESD strap and handle modules by the carrier edges only.
Tip
Keep the shipping container in case the chassis requires shipping in the future.
Note
The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or any
items are missing, contact your customer service representative immediately.
Procedure
Step 1
Remove the chassis from its cardboard container. Save all packaging material.
Step 2
Compare the shipment to the equipment list provided by your customer service representative and verify that
you have received the following items:
• Any printed documentation
• Tool-less rack-mount kit (N20-CRMK2=)—mounting rails can be installed in a rack without the use of
• ESD wrist strap
• Cables with connectors (including the N20-BKVM=, which is the KVM/local I/O console dongle)
• Any optional items ordered
To prevent loss of input power, ensure that the total maximum loads on the circuits supplying power to
the chassis are within the current ratings for the wiring and breakers.
• 10-32 screws: 20 in-lb
tools. The optional round hole adapter kit (N20-CRMK2-RHA=) does require tools.
Cisco UCS 5108 Server Chassis Installation Guide
Required Equipment
31

Advertisement

Table of Contents
loading

Table of Contents