Installing the Fabric Card Chassis Ground Cable
grounding points are also referred to as Network Equipment Building System (NEBS) bonding and grounding
point, and are provided to satisfy the Telcordia NEBS safety requirements.
Figure 1: NEBS Bonding and Grounding Points — Rear Side of the FCC
1
NEBS bonding and grounding points (upper)
Caution
Do not remove the FCC ground cable unless the FCC is being replaced.

Required Tools and Equipment

You will need to provide the following tools and equipment:
• Number-2 Phillips screwdriver
• Ground lug
• Ground cable
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
2
Installing the Power Components
2
NEBS bonding and grounding point (lower)