Mounting Rail Weight Distribution - Cisco UCS 5108 Installation Manual

Server chassis
Hide thumbs Also See for UCS 5108:
Table of Contents

Advertisement

Installation
Figure 24: Mounting Rail Weight Distribution (Square Hole Mount Shown)
Caution
Step 2
Slide the chassis into the rack until the front flange is flat against the cage nuts. (Cage nuts are not needed in
round hole racks.)
Step 3
Using the six Phillips round washer head screws and the cage nuts (used in square hole installations), secure
the chassis by its flanges to the rack as shown.
The mounting rails may come loose and cause the chassis to fall if the weight is resting on the wrong
surface. Make sure that the bottom of the chassis is resting on the correct rail surface.
Inserting the Chassis into the Rack
Cisco UCS 5108 Server Chassis Installation Guide
41

Advertisement

Table of Contents
loading

Table of Contents