Administer the TN2501AP
After you have installed the hardware, to support an FTP session you must administer and test
the installation.
Use Avaya Site Administration for this administration.
Verify circuit pack location
1
Type list configuration board board-location and press
The System Configuration report appears. Use this report to ensure that the MultiVantage
software recognizes the TN2501AP circuit pack after it is latched in the carrier slot.
list configuration board 1c08
Board
Number
Board Type
01C08
VAL-ANNOUNCEMENT
Command successfully completed
2
Verify the following field values:
•
Board Type shows VAL-ANNOUNCEMENT
Code is TN2501AP
•
Administer the node names
1
Type change node-names ip and press
The IP Node Names screen appears. Use this screen to administer the circuit pack's node
name.
SYSTEM CONFIGURATION
Code
Vintage
TN2501AP HW00 FW001 01 02 03 04 05 06 07 08
.
Enter
October 2002
Connecting to the Customer's Network
.
Enter
page 1
Assigned Ports
u=unassigned t=tti p=psa
09 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32
U
233