Mount 110A- or 110P-type terminal blocks on the
wall
The 110A-type terminal blocks can be stacked in almost any arrangement at any height or
location on the wall. One arrangement is shown in
on page
184. The distance between the mounting screw holes on the terminal blocks is 10.8 in.
(27.4 cm). If a vertical patch cord trough is used, the distance between the mounting screw
holes is 5.31 in. (13.3 cm).
With 110P-type terminal blocks, the first block of the trunk/auxiliary field is aligned with the
left side of the media gateway. See
arrangement allows for growth on the right side of the MDF.
Route the cables from the rear of the media gateway stack to the MDF via the
1
Slack Manager'' on page
If you are installing 300-pair terminal blocks, draw a level horizontal line on the wall
2
47.5 in. (1.2 m) above the floor. See
184.
If you are installing 900-pair terminal blocks, draw a level horizontal line on the wall 23
in. (58.4 cm) above the floor. See
185.
To mount the first trunk/auxiliary field terminal block, partially install 2 3/4-in. #12
3
wood screws, 7-11/16 in. (19.5 cm) apart on the left side of the horizontal line on the
wall.
4
Slide the bottom terminal block ft onto the mounting screws and mark the upper
mounting screw locations.
Remove the terminal block and partially install the upper mounting screws.
5
6
Place the terminal block on the mounting screws and tighten the screws.
If installing a vertical patch cord trough, partially install the first screw for the patch cord
7
trough, on the line, 7/8-in. (2.2 cm) to the right of the previous screw. Partially install the
second mounting screw 5.31 in. (13.5 cm) to the right of the screw just installed. Repeat
Steps 4, 5, and 6.
If another trunk/auxiliary field terminal block is to be installed, partially install the first
8
screw for the terminal block, on the line, 7/8-in. (2.2 cm) to the right of the previous
screw. Partially install the second mounting screw 7-11/16 in. (19.5 cm) to the right of
the screw just installed. Repeat Steps 4, 5, and 6.
9
If a horizontal patch cord trough is to be installed, install it, on the line, between the
trunk/auxiliary field and the distribution field.
10
To install the first distribution field terminal block, partially install 2 3/4-in., #12 wood
screws, 7-11/16 in. (19.5 cm) apart on the line, to the right of the vertical patch cord
trough. Repeat Steps 4, 5, and 6.
Patch Cord/Jumper Installation and Administration
''110A-Type Terminal Blocks (300-Pair)''
''110P-Type Terminal Blocks (900-Pair)'' on page
159. See
''Install Cable Slack Managers'' on page
''110A-Type Terminal Blocks (300-Pair)'' on page
''110P-Type Terminal Blocks (900-Pair)'' on page
October 2002
183
185. This
''Cable
187.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcc1Scc1

Table of Contents