Chapter 4 Installation And Wiring; Installation Cautions - PROFACE PL-B910 Series User Manual

Table of Contents

Advertisement

Chapter
4
This chapter explains how to install and wire the PL-B900/PL-B910 series units, as
well as the cautions required both before and during installation.
4.1

Installation Cautions

OK
Vertical Installation
PL B900/B910 Series Users Manual
Installation and Wiring
100mm
30mm
Temperature Sensor
o
o
5
C to 50
C (with fan)
o
o
5
C to 40
C (without fan)
Horizontal Installation
No more than 30 degrees of tilt
4-1 Installation Cautions
4-2 Installing the PL
4-3 Wiring the PL
1) Temperature Related Cautions
The PL should be installed in a vertical po-
sition, and forced air cooling should be used,
instead of natural air circulation.
Be sure to confirm that the area near the
PL will be within the allowable tempera-
ture range by placing a temperature sen-
sor in the location shown in the left-side
drawing. If this area's temperature exceeds
the allowed limit, a machine breakdown
can occur.
2) Installation Positioning Cautions
Be sure to install the panel in an upright
(vertical) position.
Also, be sure that the panel's viewing
angle is tilted no more than 30 degrees
from parallel to the operator (i.e. directly
in front).
4-1