PL B900/B910 Series Users Manual
4) Push the unit in the direction of the
Push up
5) Insert the FDD unit so that its guide
6) Fix the unit in place with its two(2)
7) Last, replace the Blank Panel (re-
arrow so that the adjustment screw
is in the top-most position. Next,
secure the unit in place by tighten-
ing all four (4) (upper and lower)
screws.
grooves fit the chassis holder's
guideways. Push the unit into the
holder until its connector (middle
of unit) is connected securely.
When installing the PL-FD210,
insert it slowly into the PL's in-
stallation opening and be sure
it is securely attached.
attachment screws.
moved in step 3).
3-7