Chapter 2 - Specifications
! ! ! ! ! Drilling Attachment Bracket Attachment Holes
Use the following dimension drawing to drill the attachment bracket attachment
holes in the installation panel. Use M4 size screws for the screw holes.
(Unit: mm - excluding projections)
90.1 (3.55)
• Depending on the panel's material and design, the panel's installa-
tion surface may need to be strengthened. If high levels of vibration
are expected and the PL's installation surface (i.e. an operation
panel's door, etc.) can move (i.e.open or close) due consideration
should be given to the PL's weight.
• Be sure all installation tolerances are maintained to prevent the unit
from falling out of its installation panel.
PL B900/B910 Series Users Manual
+1
360.3
(14.19
-0
105.4 (4.15)
Front View Drawing
2.1.3 Environmental
+0.04
)
-0
2-15