Chevrolet 10 1971 Series Chassis Service Manual page 378

Table of Contents

Advertisement

WHEELS AND TIRES 10-10
3.WHILE PRYING WITH RIM
4.
CO NTINUE TAPPING
R IN G WITH MALLET
W O R K IN G IN THIS
DIRECTION TOW ARDS
FARTHEST CUT-OUT
2.INSERT TOOL A N D PRYJ
RIN G D O W N A N D OVER
RIM GUTTER
1. INSERT R IN G HALF O PPO SITE
TOOL NOTCH INTO RIM GUTTER
UNTIL CUT-OUTS ST R A D D L E
THE RIM
Fig. 19— Assembling Side Ring
TOOL G IVE R IN G A
SHARP BLOW WITH MALLET
IN THIS AREA W HICH
WILL START SEC O N D HALF
OF R IN G INTO PO SITION
/
Fig. 20— Forcing Ring into Gutter
10-30 CHEVROLET TRUCK SERVICE MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

20 1971 series30 1971 series

Table of Contents