Beckhoff EL2124 Documentation page 96

Digital output terminals
Table of Contents

Advertisement

Commissioning
Fig. 77: Choose target system (remote)
In this sample "Runtime system 1 (port 801)" is selected and confirmed. Link the PLC with the real-time
system via menu option "Online" → "Login", the F11 key or by clicking on the symbol
. The control
program can then be loaded for execution. This results in the message "No program on the controller!
Should the new program be loaded?", which should be acknowledged with "Yes". The runtime environment
is ready for the program start:
96
Version: 5.2
EL20xx, EL2124

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents