Christie Roadie HD+35K Setup Manual page 13

Hide thumbs Also See for Roadie HD+35K:
Table of Contents

Advertisement

a. Connect the 2 DC power cables and 2 communication and control cables to the rear of the projector.
b. Connect the lamp ballast power cord to an AC supply.
NOTE: Before you connect the ballast power cord to AC power, a Christie accredited service
technician must verify the ballast power cord plug and input power range switch match the line
voltage at the installation location.
c. Confirm the status lights on the lamp ballast are on and that the adjacent voltmeter displays the correct
AC level for your location. NOTE: For China models the main ballast breaker must be in the ON
position (the Lamp Breaker can be Off).
d. Turn the ballast breakers/power switches on.
Roadie HD+35K Setup Guide
020-100394-06 Rev. 1 (10-2013)
Figure 2-1 Connecting the Lamp Ballast to the Projector
Section 2: Installation and Setup
2-3

Advertisement

Table of Contents
loading

Table of Contents