Activation of Z-6 turns NAC-1 and NAC-2 steady.
i
For the use of the system for pre-action, deluge releasing applications.
Acceptable, Approved solenoids for the FR-320 are listed in Appendix B.
Secondary power supply must provide for minimum of 90 hours of standby
operation followed by 10 minutes of releasing and alarm operation. See 18.0
Appendix F: Power Supply and Battery Calculations on page 104.
Minimum secondary supply voltage for this application is 21.1 VDC. In order to
maintain required operating voltage at the solenoid, wiring lengths must not be
as such as to exceed the maximum line resistance value of 1 Ohms at a
maximum load of 1A.
Initiating device circuits must be Class A for this application, thus necessitating
use of the ICAC-306 Class A Converter Module.
Pre-Programmed Modes
93

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FR-320 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Fr-320Fr-320-wFr-320-rFr-320-drFr-320-dw

Table of Contents