Perkins 1104E Series Troubleshooting Manual page 193

Table of Contents

Advertisement

RENR2696-01
Illustration 105
Connections for the fuel injection pump control unit and VLPM
Note: This test is designed to measure the resistance
of the pump power supply by allowing a current to
flow through the supply circuit and measuring the
voltage drop.
A. Remove the following wires from the P20/J20
machine interface connector:
P20:48 + Machine Batt
P20:58 - Machine Batt
P20:42 Fuel Pump Power Control
P20:68 - Batt
B. Insert a resistor into the following "MIC" pin
connections:
P20:48
P20:58
C. Connect a switch to P20:42 and P20:68.
All connectors, pins, and sockets should be
completely coupled and/or inserted.
D. Connect a multimeter and ensure that the voltage
is 0 volts while the switch is in the "OPEN"
condition.
E. Turn the switch to the OFF position and record
the voltage.
Expected Result:
The resistance is less than 50 m ohms for a 12 V
application.
The resistance is less than 80 m ohms for a 24 V
application.
Results:
OK – STOP.
193
Troubleshooting Section
g00907931

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rh11-upRf11-up1106e seriesVk11-upRk11-up

Table of Contents