Operation; Initial System Setup - Graco Reactor 2 Series Operation

Elite integrated proportioning system
Table of Contents

Advertisement

Operation

1. Turn the main power switch ON. The Graco logo
will display until communication and initialization
is complete.
2. Press the on/off button
332636C
.
3. Verify the machine is active and the System
Status LED is illuminated green, see
Advanced Display Module (ADM), page
the System Status LED is not green, press the
ADM Power On/Off (A) button
Status LED will illuminate yellow if the machine
is disabled.

Initial System Setup

Perform the following tasks to fully setup your system.
1. Select pressure for the Pressure Imbalance
Alarm to activate. See
2. Enter, enable, or disable recipes. See
Recipes Screen, page
3. Set general system settings. See
Advanced Screen 1 — General, page
4. Set units of measure. See
Advanced Screen 2 — Units, page
5. Set USB settings.
Advanced Screen 3— USB, page
6. Set target temperatures and pressure. See
Targets, page
53.
7. Set component A and component B supply
levels. See
Maintenance, page
8. Ensure engine is at operating temperature on the
home screen.
Operation
21. If
. The System
System Screen , page
56.
50.
50.
See
50.
54.
51.
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 2 e-30iReactor 2 e-xp2i

Table of Contents