Shutdown - Graco Reactor 2 Series Operation

Elite integrated proportioning system
Table of Contents

Advertisement

Shutdown

Immediate Shutdown
NOTICE
To avoid system damage, follow daily shutdown
procedure. Use only for immediate shutdown.
For immediate shutdown, press:
Daily Shutdown
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Press
to stop the pumps.
2. Turn off all heat zones.
332636C
3. Set PRESSURE RELIEF/SPRAY valves (SA,
SB) to PRESSURE RELIEF/CIRCULATION
4. Relieve pressure.
Pressure Relief Procedure, page
5. Press
to park the Component A Pump. The
park operation is complete when green dot goes
out. Verify the park operation is complete before
moving to next step.
6. Press
to deactivate the system.
7. Turn off the air compressor, air dryer, and
breathing air.
Shutdown
See
69.
.