Check Wiring And Close Access Cover; System Configuration; Overview; Critical System Configuration Steps - Idex Pulsafeeder MPC Vector Installation, Operation & Maintenance Manual

Universal control for pulsa and eclipse. suitable for any gear, reciprocating or positive displacement pumps.
Table of Contents

Advertisement

5.4 Check Wiring and Close Access Cover

Double-check all of your electrical connections. Pay attention to polarity of all inputs and outputs. Additionally,
insure that all terminals are clamping onto the bare conductor and not on its insulation. Ensure that wires will not be
trapped or pinched when front cover is replaced and secured. Ensure that excess insulation is not removed from the
wires, as this can lead to poor connections or faulty operation.
Close the main access cover and secure the 2 screws.

6. System Configuration

6.1 Overview

Once all electrical connections have been made, your MPC VECTOR is ready for initial setup, calibration,
and operation. All setup occurs using the handheld remote user interface. The following sections detail the
procedures required to complete the MPC VECTOR configuration.
WHEN POWER IS SUPPLIED TO THE UNIT, LINE VOLTAGE IS PRESENT WITHIN THE MPC VECTOR
ENCLOSURE EVEN WHEN THE PUMP MOTOR IS OFF.
During Start-up, it is necessary to run the pump motor. This will cause fluid to discharge from the pump.
You are responsible for safely diverting flow from the pump during start-up and calibration.

6.2 Critical System Configuration Steps

For proper operation of the MPC VECTOR the following parameters and calibrations must be entered and/or
verified (recommended order of setup shown):
Step Number
Figure 5-12– Sample Analog Output Connections
Parameter(s)
27
Reference IOM
Section

Advertisement

Table of Contents
loading

Table of Contents