Idex Pulsafeeder MPC Vector Installation, Operation & Maintenance Manual page 22

Universal control for pulsa and eclipse. suitable for any gear, reciprocating or positive displacement pumps.
Table of Contents

Advertisement

Shown below is a summary of the electrical wiring steps necessary to install an MPC VECTOR (see
appropriate sections to follow for details)
1.
Connect the 3 phase pump motor.
2.
Connect the Supply Voltage, single or three phase.
3. (Optional) Connect your pump's application control wiring
a. Analog input signal(s), so the MPC VECTOR can accept a process input signal or flow meter input
b. Analog output signal, for user monitoring of speed or flow
c. Digital input signals, for example start/stop and/or tank level inputs
d. Digital output signals, for example auto/manual status and/or alarm outputs
4. Conduct a final power-up and test the MPC VECTOR
5. Go to Section 6 System Configuration for details on how to configure I/O and perform power-up tests
16

Advertisement

Table of Contents
loading

Table of Contents