Checking The Operation Of The Processor And Installing The Chemicals - Kodak X-OMAT Multiloader 300 Installation Instructions Manual

Hide thumbs Also See for X-OMAT Multiloader 300:
Table of Contents

Advertisement

II 3058-4
CHAPTER 9
CHECKING THE OPERATION OF THE PROCESSOR AND
INSTALLING THE CHEMICALS
1.
To allow correct operation of the LEVEL SENSOR, add 500 ml (8 fl oz) of:
developer to the DEVELOPER TANK
fixer to the FIXER TANK
2.
Slowly fill the DEVELOPER and FIXER TANKS with water to the overflow limit.
Warning
Dangerous Voltage
3.
Energise the main power.
(a)Unlock the MAIN POWER DISCONNECT SWITCH and move it to the "1" position.
(b) Move the CIRCUIT BREAKER CB1 to the "1" position.
4.
Use the LAP TOP COMPUTER diagnostics to check the operation of the following
components:
DRYER BLOWER
REPLENISHMENT PUMPS
RECIRCULATION PUMP - Operate the PUMP for a minimum of 10 seconds to
remove any air in the system.
WASH WATER SOLENOID
DEVELOPER SOLENOID
COVER INTERLOCK SWITCH
DEVELOPER and FIXER SENSORS
5.
Check:
that the water drains smoothly
that the plumbing system has no leakage
6.
Deenergise the main power.
KODAK AG Stuttgart
INSTALLATION INSTRUCTIONS
9-1
8/1998

Advertisement

Table of Contents
loading

This manual is also suitable for:

X-omat multiloader 300 plusXml 300

Table of Contents