Cable routing guidelines
Figure 66, Cable routing to top terminal blocks,
terminal blocks,
the MDF, respectively.
Figure 66: Cable routing to top terminal blocks
Figure notes
1
Main Distribution Frame
2
AC Power Cord (AC-powered media
gateways only)
3
Cable Slack Manager Number 1
4
Trunk/Auxiliary Field
5
Station Distribution Field
Installing the Avaya S8500 Media Server with an Avaya G650 Media Gateway
December 2003
on page 188 show typical cable routing from the media gateway to the top and bottom of
Connecting the media gateway to the main distribution frame
on page 187 and
Figure 67, Cable routing to bottom
6
Cable Slack Manager Number 2
7
Cable Slack Manager Number 3
8
Media Gateway(s)
9
To Building Cables
10
10 AWG (#25) (6 square millimeters)
Wire to Coupled Bonding Conductor
r758424b MMR 052996
187