Cable Routing Guidelines - Avaya G650 Installing

Avaya media gateway
Hide thumbs Also See for G650:
Table of Contents

Advertisement

Figure 56: Self-stick label on 25-pair cable connector

Cable routing guidelines

Figure 57, Cable routing to top terminal blocks,
terminal blocks,
the MDF, respectively.
Figure 57: Cable routing to top terminal blocks
Figure notes
1
Main Distribution Frame
2
AC Power Cord (AC-powered media
gateways only)
3
Cable Slack Manager Number 1
4
Trunk/Auxiliary Field
5
Station Distribution Field
Installing the Avaya G650 Media Gateway
June 2004
Connecting the media gateway to the main distribution frame
on page 120 show typical cable routing from the media gateway to the top and bottom of
on page 119 and
Figure 58, Cable routing to bottom
6
Cable Slack Manager Number 2
7
Cable Slack Manager Number 3
8
Media Gateway(s)
9
To Building Cables
10
10 AWG (#25) (6 square millimeters)
Wire to Coupled Bonding Conductor
r758424b MMR 052996
119