Operating Instructions
7.3.5
Use of the built-in control panel or SynView
The service controls are not normally required with commissioned devices. However, if
one wishes to use these via the built-in control panel, e.g. in order to read out actual
values, setting values or the software number, this can be done by pressing the arrow
keys as shown in the table in section 7.1.1. The commands do not have any effect on
the function of SYNCHROTACT 5 as long as no blocking command is given, i.e. the
device remains in READY or OPERATING status (LEDs).
For better orientation within the menu, please refer to 4.1.1 Menu structure.
During operation phase, SYNCHROTACT 5 may be permanently connected to a
engineering workstation. In this case, for security reasons it is recommended to use a
SynView version with optional password, i.e.,  V3.0. The optional password can be
used to prevent writing data to the SYNCHROTACT 5.
Notes on the connection and on how to use can be found in section 7.2.
7.4
Operation via IEC 61850 - interface
The IEC 61850 – interface can be used for both maintenance and operating purposes.
The configuration with the "SYN61850Config"-tool takes place over a direct connection,
the actual operation via the IEC 61850-Network.
7.4.1
Direct connection SYNCHROTACT - PC to configuration
Cable : crossed-over
Preparation SYNCHROTACT 5 : none
Preparation PC : The PC must be configured with a specific IP-address within the same
subnet as the SYNCHROTACT 5 – device. The IP-address must not be obtained
automatically. The IP-Address itself should be different (see chapter 7.2.1). If the
Service
IP-Address
SYN61850Config-Tool can search for SYNCHROTACT 5 – devices.
The SYN61850Config can afterwards be started and the SYNCHROTACT 5 – device
with the corresponding Service IP-Address can be selected.
If the PC is temporarily operated on a network with support of the automatic IP-address
Note
allocation, the PC should be reconfigured to „obtain an IP-address automatically". after
commissioning.
7.4.2
IEC 61850 Network connection
Functional operation is made over the IEC 61850 network. The application-specific
operating IP-address is configured in the SCD-File by the appropriate engineering team.
abb
ABB Switzerland Ltd
Template: CHIND Techn doc stand, A4 P de, R1.DOT; Filename: 3BHS109762E01 D.doc; Print: 12/6/2011 5:48:00 PM; Save: 12/1/2011 2:37:00 PM; CHIND No. 3BHS109763 ZAB D14 Rev. -; I-Q
and
Subnet
are
Document No Art Part
3BHS109762 E01
unknown,
the
Scan
Language
en
SYN 5201/SYN 5202
function
of
the
Revision
page
D
88