ABB SYN 5201 Operating Instructions Manual page 28

Table of Contents

Advertisement

Operating Instructions
3.3
Rear of unit
The electrical connections are made on the rear of the unit by means of screwed
connectors and spring-clip terminals.
Measuring inputs
With SYN 5202, the measuring inputs are passed to a separate connector for each
channel. Each input is connected by means of double terminals.
Paralleling command output
The command output is actuated by one safety relay per channel with forcibly guided
contacts. The relay contacts of channels 1 and 2 are internally wired in series and are
passed to one connector.
Digital inputs and outputs
All inputs and outputs are potential-isolated from one another and from the electronics.
SynView connection
An Ethernet interface is provided for the connection of SynView
Time sync. connection
A connection for time signals from a clock is provided
Blocking input for operating remote control
With this input, the operating remote control (interface) can be blocked.
Communications connection (option)
SYNCHROTACT 5 can optionally be equipped with a connection for operating remote
control (see type code, section 3.1).
abb
ABB Switzerland Ltd
Template: CHIND Techn doc stand, A4 P de, R1.DOT; Filename: 3BHS109762E01 D.doc; Print: 12/6/2011 5:48:00 PM; Save: 12/1/2011 2:37:00 PM; CHIND No. 3BHS109763 ZAB D14 Rev. -; I-Q
Document No Art Part
3BHS109762 E01
SYN 5201/SYN 5202
Language
Revision
page
en
D
28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Synchrotact 5Syn 5202

Table of Contents