Mounting Implement - Zetor UTILIX CL Operator's Manual

Hide thumbs Also See for UTILIX CL:
Table of Contents

Advertisement

Mounting implement

If the PTO is used, remove the safety cover off the PTO shaft.
Adjust the yoke rod on the lower links to suit the implement in use.
Attach the left lower link, then attach the right lower link using the adjusting handle on the leveling box if
required.
Attach the top link.
Attach the PTO shaft to the tractor if used, making sure that it is locked in place.
Adjust the check chains to suit the implement and tighten the locknuts.
To remove an implement reverses the procedure.
1 - PTO shield cover
Caution: Do not attach a PTO shaft with the
engine running and ensure all safety shields are in
place.
CONTROLS, INSTRUMENTS & OPERATIONS
72
U18N055A
U18N055B

Advertisement

Table of Contents
loading

Table of Contents