Lubrication & Maintenance; Check And Service; Service Inspections; Pre-Start Checks - Zetor UTILIX CL Operator's Manual

Hide thumbs Also See for UTILIX CL:
Table of Contents

Advertisement

Check and service

This section gives full details of the service procedures necessary to maintain your tractor at peak efficiency
while the lubrication and maintenance chart provides a ready reference to these requirements.

Service inspections

Service inspections are performed as follows:
The first service inspection at the state of the engine hour counter of 50 EH maximum, but not later than
6 months after commissioning of the tractor. The second service inspection after covering another 200 EH
(at the state of the engine hour counter of 250 EH maximum) but not later than 12 months after the first
service inspection. Next service inspections always after covering another 250 EH but not later than 12
months after the previous service inspection. The service inspections are a part of tractor maintenance. The
services authorized by Zetor will provide professional performance of service inspections according to the
manufacturer's instructions.

Pre-start checks

To avoid problems it is recommended that a range of checks be carried out daily before starting the tractor.
For full details of the items and frequency please refer to the following tables - Periodical check and service
tables.

Engine coolant

Remove the radiator cap and ensure that the coolant is up
to the filler neck and that it is clean with the correct anti-
freeze or anti corrosion inhibitor in it.
1 - Radiator cap
2 - Reservoir tank
If the coolant is a rusty color, drain the system completely
and refill with the correct mixture of water and anti-freeze
or corrosion inhibitor.
1 - Drain cock
CONTROLS, INSTRUMENTS & OPERATIONS
75
UCL18N054
UCL18N055

Advertisement

Table of Contents
loading

Table of Contents