Adjustment of the lift link on the lower link

1 - Lift arm
2 - Lower link
3 - For stabilizer
4 - Extendable type
5 - Position A
6 - Lift link
For different applications change the position of the lift rod
on the lower links as shown and insert the pin in the
direction of the arrow.

Mounting implement

Caution: Do not attach a PTO shaft while the engine is running and ensure all safety shields
are in place.
1 - Position A
2 - Position B
3 - PTO shaft
If the PTO is used, remove the safety cover off the PTO
shaft.
Adjust the yoke rod on the lower links to suit the
implement in use.
Attach the left lower link, then attach the right lower link
using the adjusting handle on the leveling box if required.
Attach the top link.
Attach the PTO shaft to the tractor if used, making sure
that it is locked in place.
Adjust the check chains to suit the implement and tighten
the locknuts.
To remove an implement reverses the procedure.
1 - PTO shaft cover
Caution: Do not attach a PTO shaft while the engine is running and ensure all safety shields
are in place.
Caution:
Only use drawbar to tow and keep the 3 point linkage in raised position when toeing with the
drawbar.
Position can create unbalance causing the tractor to roll-over & result the death or serious