HPE Edgeline EL300 Setup And Configuration Manual page 41

Converged edge system
Table of Contents

Advertisement

2. For brick and concrete wall - Install the wall mounting base panel:
a. Identify the location for installing the mounting panel.
b. Place the wall mount base panel on the selected location one the wall and mark the position of all the screw mounting
holes.
c. Drill pilot holes on the marked screw locations and install the wall anchors.
d. Install the top two screws halfway and hang the wall mount
e. Secure the base panel by tightening all the screws.
3. Install the system on the wall mount base panel:
a. Align the system mounted on brackets with the spools of the base panel.
b. Secure the system with screws.
System mount options
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents