System installation site requirements
Before installing the system, verify that the following site requirements are met:
•
Space and airflow requirements
Temperature requirements
•
Power requirements
•
HPE recommends that you install or position the system in a location with restricted access, where the access is secured and
controlled. The users/technicians handling the system should be informed about the restrictions applied and precautions to be
taken.
Space and airflow requirements
To allow for servicing and adequate airflow, observe the following space and airflow requirements:
Leave a minimum 20 cm (7.9 in) clearance space at the top, bottom, and front of the system.
CAUTION: To prevent improper cooling and damage to the equipment, do not cover the system.
18
Components and site requirements
Description
LTE antenna (optional)
WiFi antenna (optional)
Antenna port
iSM antenna (Management)