12 Electrical connection
c Strip approximately 5 inches off from the outer insulation of the power installation cable
(2).
d Insert the free end of the power installation cable into the connection box (3) through the
metal strain relief (4).
e For the following connections: Use twist-on wire connectors ("wire nuts") (5), that are ap-
proved for the application. The wires should be stripped according to the instructions for the
used wire connector. Be aware, local code shall be followed.
Connect the (white) neutral wire of the power installation cable with the AWG18 (white)
neutral wire that extends from the CPD metal housing (6).
Connect the (black) phase wire of the power installation cable with the free AWG18
(black) wire of the cable of the rocker switch assembly (7).
Connect the solid green earth wire (8), that is attached to the bottom of the connection
box, with the green earth wire of the power installation cable (2), and the green earth wire
of the interconnection cable (9).
f Tuck the slack of the wires into the largest compartment, between the CPD metal housing
(6) and the wall of the connection box. Be careful not to place connectors, or excessive loops
of wire, on top of the CPD metal housing as they might interfere with the fastening of the
cover.
g Fasten the lid (1) of the connection box.