Maintenance Plan - Assa Abloy Besam SW200i US Installation And Service Manual

Swing door operator
Table of Contents

Advertisement

18

Maintenance plan

Regular inspections shall be made according to national regulations by a trained and qualified
person. The number of service occasions shall be in accordance with national requirements.
This is especially important when the installation concerns a fire-approved door or a door with
an emergency opening function. Refer to Besam Pro-Active Care option services to learn more
about service possibilities!
As with all other technical products, an automatic door needs maintenance and service. It is
essential to know the importance of maintenance to have a reliable and safe product.
Service and adjustments will ensure a safe and proper operation of an automatic door unit.
The table below shows the recommended interval, in months, when to replace parts during
preventive maintenance.
Part
PUSH arm service kit
PULL arm service kit
Stop arm kit
Micro switch kit
Adaptor kit
Transmission unit
Connection box kit
Control unit CU-200 with EXU-
boards
1007718-US-3.0
Part number
330000271 SI/BK
330000272 SI/BK
330000276
330000275
330000270
331007291
331007504 BK
331008346
Issue 2012-06-27
18 Maintenance plan
Cycles/hour in operation
<10
<100
>100
Low
Medium
High
traffic
traffic
traffic
24
12
24
12
24
12
24
12
24
12
60
60
60
60
60
60
60
60
60
Abusive
Environ-
ment
6
6
6
6
6
6
6
6
6
6
60
60
60
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents