Notes On Operation; Connection And Start-Up; Device Start-Up; Self-Test Routine - Physiomed IONOSON-Jubilee Operating Instructions Manual

Table of Contents

Advertisement

3 Notes on Operation

3.1

Connection and Start-up

Connecting the unit
(1) Check whether the operating voltage of the device (see red window in the mains
module) <1> ) and the line voltage correspond.
(2) Plug the supplied mains lead firmly into the rear panel of the device (mains module
<1>) and connect it to the socket. A safe connection is established via a grounding
socket outlet with protective wire.

3.2 Device Start-up

Note
Prior to switching on the device, please make sure that the activated ultra-
sonic transducer is outside the water in a clean condition.
(1) Make sure that the instrument is switched off.
(2) Turn both intensity control <6> and dose control <8> to 0.
(3) Plug the patient lead into the patient lead connector <11> and the ultrasonic trans-
ducer into the ultrasonic transducer connector <12>.
(4) Switch on the device with the mains switch (mains module <1>).
The instrument will carry out an automatic self-test routine during which all functions
and output values are checked and the transducer is calibrated.
An acoustic signal is issued.
The instrument is ready now. You are in the start menu.
Warning Take care that the electrodes are by no means touched after the current is
turned up!
3.3

Self-test routine

(1) Turn both intensity control <6> and dose control <8> to 0.
(2) Switch the device off and on with the mains switch (mains module <1>).
The instrument will carry out an automatic self-test routine during which all functions
and output values are checked and the transducer is calibrated.
An acoustic signal is issued.
(3) The instrument is ready now. You are in the start menu.
IONOSON-Jubilee
Notes on Operation
23

Advertisement

Table of Contents
loading

Table of Contents