Komatsu PC210-8 Shop Manual page 1007

Hydraulic excavator
Hide thumbs Also See for PC210-8:
Table of Contents

Advertisement

50 Disassembly and assembly
12. Move cover (9).
13. Lift out hydraulic oil cooler assembly (10) by
using eyebolt (M10) [1]. [*1]
4
Hydraulic oil cooler assembly: 25 kg
PC210, 230, 240-8
Installation
Installation is done in the reverse order of re-
q
moval.
[*1]
a Confirm that the heat insulating seal material
(sponge) of the radiator peripheral part is not
damaged. If the heat insulating seal material
(sponge) is damaged, replace it to the new one.
Confirm from the under cover side that convexity
(A) of the radiator is correctly set to concavity (B).
Refilling with oil (hydraulic tank)
q
Refill hydraulic oil through the oil filler port to
the specified level. Let the oil circulate in the
hydraulic system by starting the engine. Then
check the oil level again.
UEN00660-00
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc240lc-8Pc240nlc-8Pc210nlc-8Pc210lc-8Pc230nhd-8

Table of Contents