Electrical Connections And Devices - FULTON Endura EDR-750 Installation And Operation Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr
Hide thumbs Also See for Endura EDR-750:
Table of Contents

Advertisement

SECTION 2
EDR-IOM-2019-0212
9. If a header is supplied, mount the header as shown in the mechanical
drawing.
NOTEE:
For piping supplied in sections, make up and connect hand tight until all
sections are in place to ensure sections align properly. Sections are match marked
for reassembly.
10. Tighten all connections, including threaded and flanged factory
connections which may loosen during shipment.
11. Pneumatically test the piping (at 15 psig [103 kPa]maximum) prior to filling
the systems.
12. Check bolts and connections for tightness after the first heat up cycle.
Retorquing may be required.

Electrical Connections and Devices

The boiler is designed to operate within the following limits at the connection
terminals:
AC power supplied is within +/- 10% of the motor rated voltage with the
ƒ
rated frequency applied; or AC power supplied is within +/- 5% of the rated
frequency and with the rated voltage; or a combined variation in voltage
and frequency of +/-10% (sum of absolute values) of rated values provided
the frequency variation does not exceed +/-5% of rated frequency.
There is no warranty on components that fail due to improper electrical
ƒ
service.
Full Load Amps (FLA) is the measured amperage for the boiler at its maximum
operating condition at rated voltage. The type of breaker/fusing selected, in
combination with the FLA, will affect proper circuit sizing/protection. Please refer
to your state's adoption of NEC or the authority having jurisdiction for proper
sizing/selection.
A connection box has been provided on the back of the unit for high voltage
wiring. A conduit knock-out has been provided on the top of the unit for low
volatage and communication wiring. Do not run Building Management System
(BMS) or any other communication wiring into the high voltage box.
The Endura cabinet has removable panels to facilitate access. Do not run conduit
through or over access panels.
Adhere to the following when making electrical connections:
1. Install wiring and ground in boiler in accordance with authority having
jurisdiction or in absence of such requirements National Electrical Code,
ANSI/NFPA 70.
2. Connect power to the boiler inside of the customer connection box using
connectors rated for the minimum in Table 1, and are compliant with local
electrical codes.
Questions? Please Contact Your Local Manufacturer's Representative
INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
2-35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr-1000Endura edr-1500Endura edr-2000

Table of Contents