Domestic Hot Water (Dhw) Temperature Sensor - FULTON Endura EDR-750 Installation And Operation Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr
Hide thumbs Also See for Endura EDR-750:
Table of Contents

Advertisement

SECTION 3
EDR-IOM-2019-0212
From the Lead Lag Master Configuration screen Select the box labeled Advanced
Settings in the bottom right hand corner. Use the left and right arrows to scroll
to the screen labeled rate allocation. The Factory default setting for base load
common is 40%.
ƒ
Rate Allocation (Figure 57): Minimum percentage of fan RPMs a boiler will
operate. All boilers in the lead lag boiler plant have to be firing prior to any
boiler operating above 40% fan speed.
ƒ Domestic Hot Water (DHW) Temperature Sensor
From the boiler status screen select configuration. Scroll to and select Sensor
configuration (Figure 58). The row labeled " *S6S7 (J9-1,3) Sensor (DHW) must be
set to 10K NTC dual safety.
FIGURE 58 - DHW SENSOR CONFIGURATION
For a lead lag boiler plant the DHW configuration must be done through the
master lead lag configuration advanced settings. From the configuration screen
scroll to and select Lead Lag Master Configuration. Select the box in the bottom
right hand corner labeled "advanced settings". Using the left and right arrow
Questions? Please Contact Your Local Manufacturer's Representative
FIGURE 57 - RATE ALLOCATION
OPERATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Non-Fulton product information is for
reference purposes only. No Fulton
document may substitute for full
review of documentation available
from the component manufacturer.
3-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr-1000Endura edr-1500Endura edr-2000

Table of Contents