Electrical Connections - FULTON Reliance 500 Installation And Operation Manual

Table of Contents

Advertisement

SECTION 2
RLN-IOM-2012-1205
level (for applicable geographical areas). The termination of the vent
system shall not be located in tra c areas such as walk ways, adjacent
buildings, operable windows and building openings unless the venting
system is at least 7 ft (21.3 m) above nished grade, (National Fuel Gas
Code, ANSI Z223.1). The vent terminations must be at least 4 feet (1.22
m) horizontally from electric meters, gas meters, regulators, and relief
equipment. See Figure 12.
2. When installing inlet and exhaust terminations on the same wall, the
exhaust outlet must be installed 3 ft (.914 m) minimum above and
downwind from air supply inlet to prevent exhaust recirculation. Under
certain wind conditions, some building materials may be a ected by ue
products expelled in close proximity to unprotected surfaces. Sealing
or shielding of the exposed surfaces with a corrosion resistant material
(such as an aluminum sheet) may be required to prevent staining or
deterioration.
3. Do not locate the vent termination too close to shrubbery as ue products
may stunt their growth or kill them.
4. The minimum vent height should extend at least 3 ft (.914 m) above the
roof, or at least 2 ft (.609 m) above the highest part of any structure within
10 ft (3.04 m) of the vent.
5. If the exhaust vent terminates within 10 ft (3.04 m) horizontally of the
air inlet, the exhaust vent must be at least 4 ft (1.22 m) above the inlet.
Dimensions listed above and those illustrated are minimum, and may or
may not be su cient for conditions at a speci c job site.
6. To prevent the possible re-circulation of ue gases, the vent designer
must take into consideration such things as prevailing winds, eddy zones,
building con gurations, etc. Fulton cannot be responsible for the e ects
such adverse conditions may have on the operation of the boilers. It is
important to locate the exhaust duct in such a way that it does not become
blocked due to snow, ice, and other natural or man-made obstructions.

Electrical Connections

Adhere to the following when installing electrical connections:
1. Install wiring and ground boiler in accordance with authority having
jurisdiction, or in absence of such requirements utilize National Electrical
Code, ANSI/NFPA 70.
2. This boiler requires an independent 120V 60Hz single phase connection.
Connect power to the terminal strip as supplied on the inside cover of the
panel box.
NOTE: Connect a ground wire to green colored ground lug in electrical control
box.
Questions? Call (315) 298-5121, or visit us online at www.fulton.com
INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Cements for plastic pipe are
ammable liquids and should
be kept away from all sources of
ignition. Proper ventilation should
be maintained to reduce the hazard
and to minimize breathing of cement
vapors. Avoid contact of cement with
skin and eyes.
Assure all electrical connections are
powered down prior to attempting
replacement or service of electrical
components or connections of the
boiler.
2-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents