Procedure For Inspecting The Air Inlet Filter; Annual Maintenance Schedule - FULTON Endura EDR-750 Installation And Operation Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr
Hide thumbs Also See for Endura EDR-750:
Table of Contents

Advertisement

SECTION 4
EDR-IOM-2019-0212
2. Test operating temperature control by reducing temperature setting as
necessary to check burner operation.
3. Check flue gas temperature at outlet. If there is a temperature increase over
previous readings, the probable cause is soot or water-scale build-up on the
tubes. Consult Fulton Heating Solutions immediately if there is a concern.
4. Test low gas pressure switch and high gas pressure switch utilizing the
procedure in Operation section of this manual.
5. Inspect the combustion air inlet filter. If dust, lint or debris has accumulated,
replace the filter.

Procedure for Inspecting the Air Inlet Filter

Proceed as follows:
1. Remove the filter. The filter sits in the slot above the cabinet.
2. If debris has plugged or contaminated the filter, the filter must be replaced.
NOTEE:
Operating the burner with the combustion air filter removed will void the
burner warranty. A clean filter of the same Fulton part number (type, size and
style) must be installed while the boiler is in operation.
3. Return the filter to its original position in the slot.

Annual Maintenance Schedule

Annual maintenance must be performed prior to each heating season, and
includes but is not limited to the following tasks, which must be done by a
factory trained technician:
1. Inspect the fuel train, burner and control panel to be sure components are
free of debris and are properly attached to the boiler.
2. Replace the combustion air filter with a new filter of the same Fulton part
number (type, size and style).
3. Examine the venting system (air intake and exhaust piping).
Check all joints and pipe connections for tightness.
ƒ
Check piping for corrosion or deterioration.
ƒ
Check that the piping is clear of debris.
ƒ
Check that the condensate drain system is functioning.
ƒ
4. Inspect the hydronic heating system for other problems.
5. Leak test and inspect the filter of the gas valve. See Replacing Gas Valve
Internal Filter section of this manual.
6. Clean the low water cut-out probe on the water outlet pipe. This can be
accessed via the top removable panel.
7. Clean the venturi with a clean cloth to remove dust build up.
8. Remove and inspect burner. Clean as necessary. See Removing and
Cleaning Burner section of this manual.
Questions? Please Contact Your Local Manufacturer's Representative
MAINTENANCE
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Never use open flame or other sources
of ignition to check for gas leaks.
Ensure boiler is off and cooled,
with proper lockout - tagout per
local codes prior to service and
maintenance.
4
CAUTION
Use caution when using any cleaning
solutions. Refer to local regulations for
proper cleaning solution disposal.
Do not allow dust or dirt to accumulate
around the boiler.
4-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr-1000Endura edr-1500Endura edr-2000

Table of Contents