SECTION 4
EDR-IOM-2019-0212
PROBLEM
Flame lost early in run -
Lockout 107
Ignition failed - Lockout
109
Flame lost in run - Lockout
108
Waiting for Safety Data
Verification - Lockout 2
Flame detected out of
sequence - Lockout 105
Questions? Please Contact Your Local Manufacturer's Representative
CAUSE
CHECK
Power / Wiring/
1. Verify the transformer ground; the connection point should be to bare
metal and free of paint or powder coat with an appropriately sized star
Connections
washer installed.
2. Confirm the wiring harness and connections for 120VAC power and
between the blower and SOLA base.
Controller / Settings
Increase light off RPM rate (Configure Menu >> Burner Control Timings and
Rates) without exceeding approved ranges.
Boiler / Maintenance Items
1. Verify that the Dungs gas filter is clean (blue). See page 4-4 in the Manual
2. Verify that the 3-Position Damper is 'closed' perpendicular to the air intake
pipe when the unit is off, and adjusts to the appropriate 25-30 degree range
during light off.
3. Confirm that the correct ignitor for the burner is installed with the bridge,
proper offset, and proper gaping. See page 4-5 in the Manual.
4. Verify that the ignition transformer has power and the Ignitor is sparking.
5. Verify Gas pressure (Incoming to the Dungs lockup regulator >4"WC at high
fire, Incoming to Dungs MBC gas valve >3"WC at high fire)
6. Verify that solenoid on the enrichment gas train is actuated during light off
and an appropriate amount of gas pressure is seen (1.0 to 3.5"WC)
7. Verify Venting Pressures and Configurations. See page 2-21 in the manual
for acceptable ranges and installation.
8. Increase the MBC Dungs Valve Offset up to 1 full turn positive.
9. Pull the burner. Inspect for dirt/dust that could cause it to clog and any
other physical issue.
Boiler / Maintenance Items
1. Verify Gas pressure (Incoming to the Dungs lockup regulator >4"WC at high
fire, Incoming to Dungs MBC gas valve >3"WC at high fire)
2. Verify Combustion at low and High Fire. See Tables 9 and 10 on page 3-7 of
the manual for acceptable ranges.
3. Verify Venting Pressures and Configurations. See page 2-21 in the manual
for acceptable ranges and installation.
4. Pull the burner. Inspect for dirt/dust that could cause it to clog and any
other physical issue.
Controller / Settings
** Safety Data or Settings have changed and require verification
From the Configuration Menu Select 'Verification' in the bottom right corner.
Press Begin (Login Required) and follow the prompts. Final step will be to
press/hold the reset button on the SOLA base for 2-3 seconds.
Boiler / Maintenance Items
1. Verify wiring and connection between SOLA base, UV Scanner, and
associated terminal blocks.
2. Cover or block the sight glass to prevent light from the room from being
picked up by the sensor.
3. Remove and visually inspect the UV sensor, When looking at the eye sensor
should not blink or light up. Note that overhead lights etc.... will trigger the
sensor.
4. Swap sensors with a known good unit to see if the issue follows, or replace
with new sensor.
MAINTENANCE
4-11