Electrical Connections - FULTON Caliber Installation And Operation Manual

High efficiency hydronic boilers 300,000 - 850,000 btu/hr
Table of Contents

Advertisement

INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Do not use any dangerous source of
re or smoke (e.g., lighter, candle) to
test equipment at any time.
Assure all electrical connections are
powered down prior to attempting
replacement or service of electrical
components or connections of the
boiler.
4
CAUTION
Never install a barometric damper on
ue systems designed with positive
pressure.
2-22

Electrical Connections

Adhere to the following when installing electrical connections:
1. Install wiring and ground boiler in accordance with authority having
jurisdiction, or in absence of such requirements utilize National Electrical
Code, ANSI/NFPA 70.
2. This boiler requires an independent 120V 60Hz single phase connection.
Connect power to the terminal strip as supplied on the inside cover of the
panel box.
3. Refer to Figure 3 for location of customer electrical connection.
NOTE: Connect a ground wire to green colored ground lug in electrical control
box.
SECTION 2
CAL-IOM-2012-1220
© The Fulton Companies 2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Caliber 300Caliber 500Caliber 750Caliber 850

Table of Contents