FULTON Endura EDR-750 Installation And Operation Manual page 15

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr
Hide thumbs Also See for Endura EDR-750:
Table of Contents

Advertisement

SECTION 2
EDR-IOM-2019-0212
-
INITIAL RELEASE
REV
REVISION DESCRIPTION
HEATING HOT
WATER RETURN
REMOVED CONDENSATE PIPING, UPDATED
A
This design and
The items shown in
UNLESS OTHERWISE NOTED:
CALLOUTS & DESCRIPTION. M.E.B. 1/20/15
this drawing may be
drawings are
DIMENSIONS ARE IN INCHES
TOLERANCES ON
covered by one or
proprietary and are the
REV
REVISION DESCRIPTION
FRACTIONS
1/4
more patents of The
exclusive property of
(2) PLACE DEC.
.01
Fulton Companies.
The Fulton Companies.
REVISION HISTORY
(3) PLACE DEC.
.005
The corporation does
ANGLES
2 DEG.
not permit their use
SURFACE FINISH
except with prior
250 MICRO-INCHES
written consent.
THIRD ANGLE PROJECTION
1 OF 1
FULTON ENDURA
CONDENSING HYDRONIC BOILERS
FIGURE 7 - SAMPLE PIPING LAYOUT, PRIMARY - SECONDARY PIPING; MULTIPLE BOILERS
UNLESS OTHERWISE NOTED:
This design and
The items shown in
Note: Sample piping layout (P&ID) is a general representation of system installation. Good practice should be used in system
drawings are
this drawing may be
DIMENSIONS ARE IN INCHES
TOLERANCES ON
covered by one or
proprietary and are the
FRACTIONS
1/4
more patents of The
exclusive property of
(2) PLACE DEC.
.01
Fulton Companies.
The Fulton Companies.
design, including but not limited to adequate pipe/valve sizing and natural flow path for system water.
(3) PLACE DEC.
.005
The corporation does
ANGLES
2 DEG.
not permit their use
SURFACE FINISH
except with prior
250 MICRO-INCHES
written consent.
THIRD ANGLE PROJECTION
1 OF 1
Questions? Please Contact Your Local Manufacturer's Representative
---
---
---
---
CHECKED
B.O.M.
MECH. ENG ELEC. ENG APPROVED
REVISION HISTORY
FULTON ENDURA
CONDENSING HYDRONIC BOILER
FIGURE 6 - SAMPLE PIPING LAYOUT, PRIMARY - SECONDARY PIPING; SINGLE BOILER
SMT
KDB
N/A
N/A
N/A
DRAWN BY:
MECH. ENG:
2/2/15
1/30/15
M.BERWALD
1/20/2015
SMT
2/2/2015
B.O.M.
ELEC. ENG MECH. ENG CHECKED
APPROVED
CHECKED BY:
ELEC. ENG:
N/A
N/A
B.O.M. REVIEW
APPROVED BY:
N/A
K.BOTTORFF
1/30/2015
HEATING HOT
WATER SUPPLY
BOILER (PRIMARY)
PUMP
DRAWN BY:
MECH. ENG:
JOB NUMBER:
M. BERWALD
7/7/2014
N/A
CHECKED BY:
ELEC. ENG:
PROJECT NAME:
N/A
N/A
B.O.M. REVIEW
APPROVED BY:
PROJECT MANAGER:
N/A
K.BOTTORFF
7/6/2014
---
(SECONDARY)
AIR REMOVAL
SUPPLY WATER
TEMPERATURE
SENSOR
CLOSELY SPACED TEES
(<4 DIAMETERS)
SEE NOTE 4
BOILER
(PRIMARY)
PUMP
JOB NUMBER:
DESCRIPTION:
ENDURA BOILER PRIMARY - SECONDARY
SINGLE BOILER PIPING DIAGRAM
PROJECT NAME:
PROJECT MANAGER:
SYSTEM (SECONDARY)
PUMP
AIR REMOVAL
DESCRIPTION:
ENDURA BOILER PRIMARY-SECONDARY
MODULAR PLANT PIPING DIAGRAM WITH
1" SIDE CLEARANCE
INSTALLATION
HEATING HOT
WATER SUPPLY
SYSTEM
PUMP
EXPANSION TANK
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSES
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
3.
REFER TO THE INSTALLATION AND OPERATION MANUALS FOR
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
4.
CENTER TO CENTER DISTANCE BETWEEN BOILER (PRIMARY)
SUPPLY AND RETURN MANIFOLDS SHOULD BE 4 PIPE
DIAMETERS OR LESS.
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-35-100015
SHEET 1 OF 1
EXPANSION TANK
SUPPLY WATER
TEMPERATURE SENSOR
CLOSELY SPACED TEES
SEE NOTE 5
(<4 DIAMETERS)
RETURN WATER
TEMPERATURE SENSOR
HEATING HOT
WATER RETURN
REVERSE RETURN
(SEE NOTE 4)
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSES
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
REFER TO THE INSTALLATION AND OPERATION MANUALS FOR
3.
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
4.
THE PIPING CONFIGURATION SHOULD UTILIZE A REVERSE
RETURN HEADER TO PROPERLY BALANCE FLOW ACROSS THE
BOILERS. WHERE REVERSE RETURN CANNOT BE USED, IT IS
RECOMMENDED TO INSTALL A BALANCING VALVE PER BOILER.
5.
CENTER TO CENTER DISTANCE BETWEEN BOILER (PRIMARY)
SUPPLY AND RETURN MANIFOLDS SHOULD BE 4 PIPE
DIAMETERS OR LESS.
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-35-100006
SHEET 1 OF 1