Lead/Lag Integrated Sequencing - FULTON Endura EDR-750 Installation And Operation Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr
Hide thumbs Also See for Endura EDR-750:
Table of Contents

Advertisement

SECTION 3
EDR-IOM-2019-0212
Pressing Analog I/O will place you into the Analog I/O screen (Figure 50). Specific
information on temperature, firing rate, flame signal and fan speed may be
viewed.
SOLA Hydronic Controller - Options Configuration
The screen shots and information in this section will help you configure various
options available on the Endura boiler. For further information on installation
requirements refer to the electrical portion in the Installation section.
Various parameter changes required in this section will require a verification
procedure. Refer to the previous general section for the verification sequence.
ƒ Lead/Lag Integrated Sequencing
Each boiler on the network is a slave boiler and any boiler may be selected as
the master. From the boiler status screen select configure and scroll to and select
Questions? Please Contact Your Local Manufacturer's Representative
FIGURE 49 - DIGITAL I/O
FIGURE 50 - ANALOG I/O
OPERATION
!
WARNING
Do not operate, or allow others to operate,
service or repair this equipment unless
you (they) fully understand all applicable
sections of this manual and are qualified
to operate/maintain the equipment.
Check daily that the equipment area
is free and clear of any combustible
materials, including flammable vapors
and liquids.
3-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr-1000Endura edr-1500Endura edr-2000

Table of Contents