Evaluating Ams - Xilinx Zynq-7000 Getting Started Manual

All programmable soc, evaluation kit and video and imaging kit, vivado design suite 2013.3
Hide thumbs Also See for Zynq-7000:
Table of Contents

Advertisement

Evaluating AMS

1. Connect and power the hardware.
a. Connect the ZC702 board to the AMS101 evaluation card, making sure the notch on
the XADC header lines up correctly with the AMS101 evaluation card. see
X-Ref Target - Figure 4-2
Figure 4-2: ZC702 Board with AMS101 Evaluation Card Plugged into XADC Header
2. Download the design to the Zynq-7000 AP SoC.
a. Plug the
b. Set the ZC702 board switch settings to boot from SD mode
c. Power on the ZC702 board. After about 15 seconds, the Done LED (DS3) turns green,
indicating the design file on the
Zynq-7000 AP SoC.
3. Run the AMS101 Evaluator LabVIEW GUI executable file.
a. On the Host PC, open AMS101 Evaluator GUI V1.1.exe from the desktop.
The AMS Evaluator Tool allows designers to quickly evaluate the analog signals in the time
and frequency domain, display linearity, verify the XADC register settings, and measure the
internal temperature sensor and supply voltages.
ZC702 and ZVIK Getting Started Guide
UG926 (v6.0) December 17, 2013
card into the ZC702 board.
SD MMC
www.xilinx.com
card has properly loaded onto the
SD MMC
Evaluating AMS
Figure
4-2.
Done LED
UG926_c4_02_061212
(Figure
3-4).
Send Feedback
43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Zynq-7000 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Zc702

Table of Contents