Delta RPI M50A_120 Installation And Operation Manual page 36

Table of Contents

Advertisement

5 Planning the installation
Part
Open end spanner
For grounding the inverter housing
Cables
For wiring the communication port
Cables
For using the inverter with grounded solar modules
Magnetic screw driver
Grounding fuse
Other parts
Labels
36
36
Quantity
Image/Description
1
The open end spanner is used to disconnect the DC cables from the
DC inputs.
Typically yellow/green copper cable with minimum wire size 6 mm
has to be used. Always consider local regulation regarding the cable
requirements.
Depending on which connectors you want to use (RS485, dry con-
tacts, digital inputs), you need the appropriate cables with wire size
1 mm
.
2
1
If you need to open the cover of the fuse section, you should use a
magnetic screw driver, so that the screws cannot accidentally fall into
the inverter.
1
A grounding fuse with 1 A is needed. The fuse holder is delivered with
the inverter.
-
Check local regulations whether you have to attach special safety
labels to the inverter.
WARNING
Dual Supply
Isolate on-site Generating Unit(s) at ..........................................................
Isolate mains supply at...............................................................
Isolate both sources before
Do not work on this equipment until it is isolated from
both mains and on site generation supplies
Warning – Only persons authorised by the DNO may remove the main cut out fuse
carrying out any work
Warning
Two sources of voltage present
- distribution network
- photovoltaic panels
Installation and Operation Manual for RPI M50A
Installation and Operation Manual for RPI M50A
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rpi m50a_122

Table of Contents