Power Supply; Sensor; Flow Meter; Input - Swann AMU pH-Redox Operator's Manual

Version 6.20 and higher
Table of Contents

Advertisement

AMU pH-Redox
Installation
3.9.
Installation
requirements

3.10. Sensor

3.11. Flow Meter

3.12. Input

34

Power supply

CAUTION
Do not apply power to the transmitter until all electrical connec-
tions have been made.
A
B
C
The installation must meet the following requirements:
 Mains cable according to standards IEC 60227 or IEC
60245; flammability rating FV1
 Mains equipped with an external switch or circuit-breaker
– near the instrument
– easily accessible to the operator
– marked as interrupter for AMU pH-Redox
Connect the pH or ORP sensor to the AMU transmitter according to
the connection diagram, see
For sensor settings, see
Connect the flow meter (if any) to the AMU transmitter according to
the connection diagram, see
NOTICE: Use only potential-free (dry) contacts.
Terminals 10/11
For programming see
A
Power supply connector
B
Phase conductor
C
Neutral conductor
Electrical Connections, p.
Programming, p.
Electrical Connections, p.
Program List and Explanations, p.
32.
38.
32.
61.
A-96.250.441 / 060619

Advertisement

Table of Contents
loading

Table of Contents