AMU Powercon
Installation
2.8.
Installation
requirements
2.9.
2.10. Flow Meter
2.11. Input
A-96.250.331 / 230320
Power supply
CAUTION
Do not apply power to the transmitter until all electrical connec-
tions have been made.
A
B
C
The installation must meet the following requirements:
Mains cable according to standards IEC 60227 or IEC
60245; flammability rating FV1
Mains equipped with an external switch or circuit-breaker
– near the instrument
– easily accessible to the operator
– marked as interrupter for AMU Powercon
Sensor
Connect the sensor to the AMU transmitter according to the con-
nection diagram, see
For sensor settings, see
Connect the flow meter (if any) to the AMU transmitter according to
the connection diagram, see
NOTICE: Use only potential-free (dry) contacts.
Terminals 10/11
For programming see
A
Power supply connector
B
Phase conductor
C
Neutral conductor
Electrical Connections, p.
Programming, p.
Electrical Connections, p.
Program List and Explanations, p.
17.
23.
17.
44.
19