Instrument Setup; Establish Sample Flow; Programming - Swann AMU pH-Redox Operator's Manual

Version 6.20 and higher
Table of Contents

Advertisement

AMU pH-Redox

Instrument Setup

4.
4.1.
4.2.

Programming

Calibration of
pH electrode
Calibration of
ORP electrode
38
Instrument Setup

Establish Sample Flow

1 Open sample flow tap.
2 Wait until the flow cell is completely filled.
3 Switch on power.
Programming
Set all necessary sensor parameters in menu 5.1 Installation/Sen-
sors, further information see
 Type of sensor: set the type of sensor to pH or Redox accord-
ing to your application
 Flow measurement: Set the flow measurement according to
the installed flow sensor.
 Temperature:
If a temperature sensor is installed, set Temp. sensor to yes.
If no temperature sensor is used, set the default temperature
to the expected sample temperature.
 Standard solution(s): Program the buffer values (pH buffer ta-
ble) or the ORP calibration solution if you do not use the
SWAN standard
Program all parameters for external devices (interface, recorders,
etc.). Program all parameters for instrument operation (limits,
alarms). See
Program List and Explanations, p. 61
tions.
The instrument should be operating for 1 h before performing a pH
calibration.
Calibrate the pH electrode with two buffers, e.g. pH 7.00 and pH
9.00. See
Calibration, p.
The instrument should be operating for 1 h before performing an
ORP calibration. See
5.1 Sensors, p.
48, for details.
Calibration, p.
48, for details.
65:
for explana-
A-96.250.441 / 060619

Advertisement

Table of Contents
loading

Table of Contents