5 Installation
5. Insert the optical fibers from below through the cable gland
into the splice box.
6. Splice the optical fibers with the optical fiber pigtails in the splice box.
7. Plug the subscriber connectors into the SC-P plugs in the splice box.
8. Coil the residual glass fiber in the fiber reservoir. Observe the
permissible bend radii.
9. Screw on the enclosure of the splice box.
10. Reinstall the splice box on the top-hat rail.
11. Attach the optical fibers to the cable support rail using a cable tie. This ensures that the optical fibers cannot be
pulled out inadvertently.
12. Mount the panels (see Section 12.3.1.2, page 164).
5.7.2.3

Connecting the Network Cables

Network cable requirements:
☐ The network cables must be shielded and pair-twisted.
☐ The network cables must be of at least category 5 (CAT 5).
☐ Maximum cable length: 100 m
Procedure:
1. Disassemble the panels (see Section 12.3.1.2, page 164).
2. Insert the network cables (see Section 12.4.3, page 171).
3. Insert the network cables into the network ports.
68