Name
Description
HzCtllLim
Threshold for underfre-
quency level 1
HzCtllLimTm
Delay time for underfre-
quency level 1
HzCtlllLim
Threshold for underfre-
quency level 2
HzCtlllLimTm
Delay time for underfre-
quency level 2
HzCtlMin
Threshold for underfre-
quency level 3
HzCtlMinTm
Delay time for underfre-
quency level 3
NormVac*
Measuring range end
value of AC voltage
measurement
NormAac*
Measuring range end
value of AC current mea-
surement
ManResOvrVol Manual activation after
overvoltage
ManResUn-
Manual activation after
drVol
undervoltage
ManResOvrFrq Manual activation after
overfrequency
ManResUn-
Manual activation after
drFrq
underfrequency
ManResPID
Manual activation after
interruption by passive is-
landing detection
ManResPLD
Manual activation after
interruption due to distur-
bance in a line conduc-
tor
* You can only view this parameter after entering the installer password.
System Manual
Range
Explanation
45 Hz to 50 Hz
For 50 Hz grid
55 Hz to 60 Hz
For 60 Hz grid
0 ms -
to 1,000,000 ms
45 Hz to 50 Hz
For 50 Hz grid
55 Hz to 60 Hz
For 60 Hz grid
0 ms -
to 1,000,000 ms
45 Hz to 50 Hz
For 50 Hz grid
55 Hz to 60 Hz
For 60 Hz grid
0 ms -
to 1,000,000 ms
1 V to 1,000 V
1 A to 3,000 A
Off
Deactivated
On
Activated
Off
Deactivated
On
Activated
Off
Deactivated
On
Activated
Off
Deactivated
On
Activated
Off
Deactivated
On
Activated
Off
Deactivated
On
Activated
14 Operating Data and Parameters
Default value
49 Hz
58.8 Hz
1,000 ms
48 Hz
58 Hz
600 ms
47 Hz
57 Hz
600 ms
862 V
2,219 A
Off
Off
Off
Off
Off
Off