SMA MEDIUM VOLTAGE POWER STATION 500SC-JP System Manual page 47

Hide thumbs Also See for MEDIUM VOLTAGE POWER STATION 500SC-JP:
Table of Contents

Advertisement

SMA Solar Technology AG
Procedure:
1. Use a crane to set the oil tray down in the appropriate position
so that it is aligned underneath the transformer compartment of
the MV Power Station. Take the heavy weight of the oil tray
into account.
2. Transport the MV Power Station to the mounting location (see Section 4.3, page 41).
3. Set the MV Power Station down on the support surface, and attach it if necessary.
4. Adjust the height of the oil tray to the height of the MV Power Station. Secure the oil tray against floating away if
necessary.
5. Unscrew the nuts from the stud bolts of the support feet for the service platforms and remove them together with
the washers.
6. Guide the stud bolts of the support feet for the service platform
into the working platform fittings and mount each of them with
a washer and nut (width across flats: 16 mm).
7. Remove the cable ties from the fuse of the locking mechanism.
8. Remove the locking mechanism fuse.
System Manual
4 Transport and Mounting
MVPS22JP-SH-en-11
47