9 Troubleshooting
After a grid failure, the inverter monitors the utility grid for a specific period before reconnecting. When the inverter
monitors the utility grid after a grid error, the grid monitoring time is complied with. Certain errors, such as grid errors,
cause the inverter to shut down. In this case, the instantaneous value TmsRmg indicates the time for which the inverter
monitors the utility grid before reconnecting. This grid monitoring time can be defined in parameter GdErrTm.
Error no. Explanation
0103*
Grid voltage is too high. Overvolt-
age detected by redundant moni-
toring.
0104*
Grid voltage is too high. Overvolt-
age detected by standard monitor-
ing.
0203*
Grid voltage is too low. Undervolt-
age detected by redundant moni-
toring.
0204*
Grid voltage is too low. Undervolt-
age detected by standard monitor-
ing.
0205*
Grid synchronization not possible
0404*
Frequency change per second too
high for grid operation
0502*
Power frequency is too low. Power
frequency disturbance detected by
standard monitoring.
0503*
Power frequency is too high.
Power frequency disturbance de-
tected by standard monitoring.
0504*
Power frequency is too low. Power
frequency disturbance detected by
redundant monitoring.
0505*
Power frequency is too high.
Power frequency disturbance de-
tected by redundant monitoring.
0506*
The inverter has detected a stand-
alone grid and has disconnected
from the utility grid.
0801*
One line conductor of the utility
grid has failed.
0802*
124
MVPS22JP-SH-en-11
Inverter behavior
Corrective measures
S1
S2
R
30 s
30 s
• Check the grid voltage.
• Check grid connections.
• Check stability of the utility grid.
C
C
• Make sure the external fuses work
• Make sure the AC cable connections
30 s
30 s
30 s
30 s
30 s
30 s
30 s
30 s
30 s
30 s
• Check power frequency.
• Check the display of the grid monitoring
• Make sure the fuses in the load circuit
30 s
30 s
30 s
30 s
30 s
30 s
W
W
• Check power frequency.
30 s
30 s
• Check the grid voltage.
• Make sure the external fuses work
• Make sure the AC cable connections
SMA Solar Technology AG
properly.
are tight.
relay.
function properly.