Oss - Pre-Start Inspection Of Operation - JLG 15MVL Operation And Safety Manual

Hide thumbs Also See for 15MVL:
Table of Contents

Advertisement

SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
1
2
Figure 3-10. OSS - Pre-Start Inspection of Operation.
3-40
Pre-Start Inspection
1. Electronic Module LED Indicator (a)
2. Detection Zone
3. Place a pad of paper or similar size object, 6 to 12 in. (15
to 30cm) individually beneath each transducer to
check detection.
NOTE:
(a) The LED Indicator will flash when an object is detected
at each sensor. Remove object and allow the LED to stop
flashing before testing next sensor.
3
– JLG Lift –
3121230

Advertisement

Table of Contents
loading

This manual is also suitable for:

20mvl15msp20msp

Table of Contents