AIRCRAFT OPERATOR
Name
Contact
Address
Telephone/Fax
E-mail
MAINTENANCE FACILITY
Maintenance workshop
Address
Telephone/Fax
E-mail
Certificate
This check is applicable
(circle on)
)1
leaded fuel more than 30% of operation
Next check due at:
05–20–00
Page 8
September 01/2018
BRP-Rotax
MAINTENANCE MANUAL LINE
Identification
25 hr.
50 hr.
)1
100 hr.
200 hr.
(TSN__________) (engine hr.)
1000
600 hr.
hr.
hr.
Effectivity: 912 i Series
Edition 2/Rev. 0